Bids, estimates, projects, crews, daily logs, equipment — and an AI assistant that fills in the paperwork for you. Built for the field. Designed for construction companies of every trade.
Trusted by grading · plumbing · electrical · HVAC · concrete · roofing · general contractors
Riverside Contracting
Gross Revenue YTD
$365,900
↑ 22.4% vs last year
Avg Margin
21.8%
Pipeline
$524k
Win Rate
48%
A/R
$88.2k
Clients
23
Active Bids
8
Open Est.
5
Equipment
14
Revenue · last 6 months
Avg $61k
Bid stages
The full workflow
Stop juggling spreadsheets, Word docs, and group texts. IronFrame stitches the whole job together — and your data flows downstream automatically.
01
Lead → bidding → submitted → won. No more sticky notes on the dashboard.
11 bids · $524k pipeline
Westgate Plaza
Due Jun 02
Cottonwood Lot
Due Jun 02
Smith Residence
Due Jun 02
Riverside Tower
Due Jun 02
Highland Park HOA
Due Jun 02
County Library
Due Jun 02
Maple Ridge Septic
Due Jun 02
02
Line items, labor, materials, markup. Pre-filled with your real rates from setup.
Line Items
+ Add Item
| Site clearing & rough grading | 1 lot | $5,520 |
| Excavator day rate (CAT 320) | 4 day | $5,280 |
| Crushed limestone, #57 | 18 ton | $907 |
| Geotextile fabric, woven | 1200 sf | $936 |
| Culvert install, 18" HDPE | 1 ea | $2,760 |
AI Assist
03
Phases, tasks, crew assignments, and live progress for every active project.
Phase 1 — Site Prep
Phase 2 — Drainage
04
Daily reports, photos, weather, hours. Your paper trail, digitized from the truck.
Weather
Sunny, 72°F
Hours worked
8.5 hrs · 4 crew
Project
Smith Residence
Crew on site
Notes
Phase 2 drainage trenched and culvert installed. Compaction tomorrow if rain holds off.
Photos
Trained on contractor estimates, proposals, and scopes of work. IronFrame's AI watches what you build and fills in the parts you'd rather not type.
AI Assistant · Estimate scope
Generated scope summary
Based on your 6 line items
Full site clearing and rough grading of the residential lot, including replacement of the existing 18″ HDPE culvert and final grading with #57 crushed limestone over woven geotextile fabric. Pricing assumes site is dry; rain delays billed separately.
Why IronFrame
We're not a CRM. We're not Procore. IronFrame runs your construction business from A to Z — bids, estimates, projects, crews, daily logs, equipment. One app. Every trade.
$0
per seat
Flat monthly rate. Add the whole crew without watching your bill climb.
12+
trades supported
Grading, plumbing, electrical, HVAC, concrete, roofing. Multi-trade companies are first-class.
< 2s
page loads on 4G
Built for the jobsite. Big tap targets, fast pages, works with dirty gloves on cracked screens.
90%
less typing
IronFrame Intelligence learns your rates, services, and preferences. Every doc auto-fills.
Set up your company once. Let IronFrame do the rest.